StepTone
| Name: StepTone Entwickler: Wahtcomu Ltd. Preis: Größe: 89k | Version: 1.5 minimale Android Version: 1.6 oder höher Kategorie: Tools Download: Look at the bottom of the page |
Beschreibung:
StepTone is a widget that gradually raises the call sound of the telephone.
The volume goes up from the minimum to the maximum gradually.
It changes with step tone → silent mode → vibration mode → standard mode → step tone whenever pushing.
---
docomo au softbank
xperia HTC Desire manner ringtone
wahtcomu
0 Kommentare:
Kommentar veröffentlichen